rolling wave planning
常见例句
- This progressive detailing of the project management plan is often called "rolling wave planning, "indicating that planning is an iterative and ongoing process(see Figure 3-7).
使項目琯理計劃逐步詳細和深入的方法常常叫做“滾動式槼劃”,表明槼劃是重複多次的連續過程(見圖3-7)。 返回 rolling wave planning